Developers
Developers

Better Project Economics
for Your Portfolio

An approach to volumetric modular that shortens your schedule, lowers carrying costs, and repeats across sites, including secondary markets where conventional builds stall.

35
+

Multifamily Developments

1,800
+

Completed Dwelling Units

$500M
+

in Completed Construction Value

20
+
 Years

of Delivering Modular Multifamily

Big Block developer guiding a module

Cost and Timing Clarity You Can Trust

Every development pro forma must account for schedule risk, and every month a site sits idle adds interest and carrying costs. Before a project goes to your board or financing partners, you need a cost per door you can plan around and a schedule you can hold with confidence.

That's why we get involved early, before land is secured and design is locked. Together, we look at what the site can support, what your capital will build, and where schedule risk and carrying costs sit.

How Volumetric Modular Improves Your Numbers

Volumetric modular means each unit is built as a complete module in a climate-controlled factory, then shipped to your site and craned into place. Up to 90% of the building is finished in the factory while your site is being prepared. With Big Block Construction, two stages that normally happen one after the other happen at the same time.

Modules in production

Lower Carrying and Financing Costs

Running factory and site work in parallel takes months off the construction process. Allowing you to carry less interest, reach occupancy sooner, and give the market less time to move against your pro forma.

Site supervisor reviewing plans inside a framed module

A Schedule We Commit To

Standardized designs, factory production, and clean handoffs. We repeat the same process on every project, so we know how long each step takes and where the risk sits. That's why we commit to a schedule instead of estimating one.

Truck hauling a module along a snowy mountain highway

Viable in Secondary and Remote Markets

Many smaller markets don't have enough local trades to staff a conventional build. However, with most of the building done in the factory, your project no longer hinges on local trade capacity.

Crew installing roofing on a modular building

Less Risk With Every Project

On a conventional build, costs reset with every project because nothing carries over. With Big Block Construction, a building type that works on one site can repeat on the next without a redesign.

Each new project starts from a design that's already been priced, built, and occupied. That leaves fewer unknowns to price into your pro forma. Across several sites, one successful project becomes a pipeline you can plan around.

Bring Us In at Any Stage of Your Development Journey

We can step in whether you're evaluating land, testing a concept, or preparing a funding application. The earlier we're involved, the more room we have to shape project economics around your targets.

Evaluation icon

Land Under Evaluation

Before you close on a site, we assess what it can support and what it would cost to build.

Testing icon

Testing a Concept

We test unit count, budget, and timeline against your pro forma, including concepts that aren't yet viable.

Application icon

Preparing an Application

We join your land or funding application as a named Modern Methods of Construction (MMC) partner, backed by more than 1,800 completed units.

Planning icon

Planning More Sites

Our team helps you select a building type that can repeat across your portfolio.

Crew members guiding a module into place on a multifamily site

See If Modular Can Improve Your Numbers

Bring us your multifamily development opportunity or point us to a parcel of land. We’ll test our base models on it, vet your occupancy targets, and tell you plainly whether we’re the right fit for your upcoming project.